The Swift Leveller Max offers the widest scope and greatest flexibility of any product in the Swift Leveller range. Its extended void range means you can install an outdoor building even on difficult or hard-to-reach ground, removing the need for costly and disruptive groundwork.
Like all products in the range, it works seamlessly alongside the other Swift Levellers to create a secure, stable framework for your outdoor building. It can be cut to any length on site and is concreted into position, providing a stronger, more permanent finish than other products in the range.
- Designed for harder-to-reach spots and high void levelling
- Adjustable on-site for accuracy
- Must be concreted for secure, long-lasting support
- Works alongside the other Swift Levellers in the same installation
- Offers the greatest flexibility in the Swift Leveller range
- Can be cut to length on site
- Provides a stronger, more permanent finish when concreted
- Suitable for challenging ground conditions where standard methods may not work
- Popular with professional installers on more demanding projects
- Outdoor buildings on difficult or hard-to-reach ground
- Installations with sharp drops in ground level
- Projects requiring high void levelling
- Professional installations needing a stronger, more permanent base
- Mixed installations used alongside other Swift Leveller models
- Designed to be concreted into position for permanent support
- Can be adjusted and cut on site
- Built for challenging terrain and demanding conditions
- Compatible with the full Swift Leveller range
- Engineered for strong, stable framework support
The Swift Leveller Max is built for demanding installations where difficult terrain, high voids or sharply changing ground levels require a stronger and more flexible foundation solution.
The Swift Leveller Max is built for difficult access areas and higher void levelling, and it must be concreted in for secure long-term support. Follow the sequence below to position, fix, and fine-tune the installation on site.
Clear and prepare the area, then put the base frame at the estimated height using packers.
Mark the frame at equal intervals using the plates as a guide so you can identify the correct positions for the holes.
Using the markings as your guide, dig holes into the ground to a depth of at least 350mm.
Position the Swift levelling device into the hole and screw the plate to the frame.
Ensure the bases are straight and level, then set them in place with concrete for secure, permanent support.
Once the concrete has set, adjust each nut so the frame reaches the required height, then check with a spirit level and fine-tune as needed.
Buy the Swift Leveller Max from our trusted stockists across the UK.

Fast, simple levelling for sheds, cabins, and garden buildings.
Speak with our team about your specification, project programme, and bespoke requirements.